ADR-013: Hardware-bound acceptance stays with the principal

  • Status: Accepted
  • Date: 2026-08-28
  • Source: #1, issue description, section “Decisions (ADRs, continuing the numbering of the May design doc)”; the list of hardware-bound issues is the section “Hardware-bound issues (not slices)” of the same description

“The principal” in the record is @Soushi888.

Context

From #1:

This epic is the design record for the Workshop 2026 milestone. It is owned by the PM session of a PM/Builder binôme: the PM decides, decomposes and verifies; the Builder implements in stacked PRs.

Decision

Criteria that need a Holoport, the lab router or a participant are separate issues assigned to @Soushi888. The Builder closes only what a VM or CI can prove.

Consequences

From #1, section “Hardware-bound issues (not slices)”:

Holoport vanilla NixOS boot test, dedicated router, colmena apply on the physical fleet, rollback demo on hardware, facilitator guide review with Tibi, preflight sent seven days out, and the workshop date itself. Each is its own issue, assigned to @Soushi888, labelled hardware.